Building a home on your own land starts with paperwork, and that starts with the city. If you’re planning to build in the Tri-Cities, understanding Kennewick building permits before you finalize plans can save you weeks. This guide covers when you need a permit, what to submit, how long review takes, what fees to plan for, and what changes if your lot sits outside city limits.
When Building Permits in Kennewick Are Required
For a new single family home, a permit is always required. A residential building permit is required for new single family construction, and also for remodels, additions, and most other residential projects. Building permits in Kennewick are handled by the city’s Building Department, and new homes also have to meet the city’s setback rules and zoning for the lot.
A few small projects are exempt from a building permit. According to the city, these include:
- Detached accessory structures up to 200 square feet that meet setbacks and stay off easements
- Retaining walls that don’t exceed four feet in height, measured from the footing to the top of the wall
- Finish work like painting, tiling, carpeting, and cabinetry
Anything larger, attached to the home, or structural usually needs approval. When in doubt, call the Building Safety Division before you start. It’s cheaper to ask first than to fix work after the fact.
What to Submit for Building Permits in Kennewick
Building permits in Kennewick require a complete submittal, and incomplete packages are the most common cause of delay. For a new single family residence, the city asks for:
- A completed New Single Family Residential application
- A plot plan drawn at one inch equals 20 feet, showing the sidewalk, face of curb, proposed curb cut, and sewer and water services
- Two sets of plans, including building elevations, a foundation plan, a labeled floor plan, and a cross section showing the foundation, floor joists, wall framing, and ceiling joists
- Stairway details, if the home has stairs
- Braced wall panel locations and truss reactions and layout
- Energy code compliance documentation
One detail the city flags: the parcel number, also called the tax ID number, is often left off the application. You can look it up on the Benton County Assessor’s property search.
Washington updates its energy code on a regular cycle, so confirm the current edition with the Building Safety Division before your designer finalizes the plans. Applications are submitted through Building and Development Services at City Hall, 210 W 6th Avenue, and the city also runs an online Building and Permits portal.

Express or Over the Counter: How Long Does Review Take?
Kennewick gives you two submittal paths for a new home, and the choice affects both speed and cost.
Express Permitting
Express permitting is built for speed. The city says new single family applications qualify, and it describes residential reviews finishing in under 48 hours and permits issued within two to three business days. It comes with a convenience fee of 20 percent of the permit fee. New single family express applications are submitted online and paid for when you apply. The city notes that plan quality and code compliance can change that timeline.
Over the Counter Review
The standard path has no convenience fee. The city’s pages describe typical turnaround as roughly 10 to 15 business days once the submittal is complete. If reviewers find missing information, you’ll need to respond and resubmit, which adds time.
Either way, a clean, complete set of plans is the best way to move quickly. Building permits in Kennewick don’t stall because of review itself so much as back and forth over missing items.
Fees That Come With Building Permits in Kennewick
The building permit is only one line in the budget. A new home in Kennewick also triggers utility connection charges and, depending on the area, impact fees. A few figures from the city’s Master Fee Schedule, updated in January 2026, give a sense of what’s involved:
- State building fee for residential: $6.50
- Three quarter inch water meter service fee: $770 inside city limits and $1,025 outside
- Sewer area charge: $0.04 per square foot, with a maximum of $800 for residential
- Fire impact fee in the Southridge area: $1,144.81 for a detached home
Water frontage charges, sewer stub charges, and transportation impact fees can also apply depending on where the lot is. Fee schedules change, so check the current city schedule or ask the Building Department for an estimate based on your parcel. Budgeting for building permits in Kennewick and the utility charges that come with them early keeps surprises away.
Building Permits in Kennewick vs. Benton County
Not every Kennewick address is inside Kennewick city limits. Plenty of homes with a Kennewick mailing address sit in unincorporated Benton County, and that changes who issues the permit.
If your lot is outside the city, the county handles the building permit. Benton County also points applicants to other agencies depending on the project, including the fire marshal, public works, and the Benton Franklin Health District. For lots without city sewer, septic approval from the Benton Franklin Health District is needed on most permits before you submit.
That sequencing matters. The septic location can shape where the house sits, so soil testing and septic design often come before final plans. Utility charges also differ: as shown above, water service costs more outside city limits.
Before you buy or design, confirm whether the parcel is inside the city or the county. It’s a quick check that decides your entire permit path.

Common Reasons Building Permits in Kennewick Get Delayed
Most delays are avoidable. Here’s what to watch for when you apply:
- Missing parcel or tax ID number on the application
- A plot plan that doesn’t show the curb cut, sidewalk, or sewer and water services
- Plans that don’t meet setback requirements for the zone
- Incomplete structural details like braced wall panels or truss layouts
- Septic approval still pending on a lot outside city sewer
Inspections and Certificate of Occupancy
Once your building permits in Kennewick are issued, inspections happen at key stages of construction. When the home passes final inspection, the city issues a certificate of occupancy, which you can print from Kennewick’s permit portal. You’ll need it before you can occupy the home, so build the final inspection into your schedule.
How Adair Homes Handles Permitting in Kennewick
Adair Homes builds in Kennewick and across Benton County, with its Mid Columbia Valley office at 1915 Steptoe Street. For homeowners building on their own land, Adair manages site preparation, permitting, trade coordination, and construction from start to finish, working with a network of trusted trade partners.
That means the plot plan, plan sets, and permit paperwork are handled by a team that works through building permits in Kennewick regularly, not by you. Design your home from scratch with our in-house drafting team and watch your dream home come to life, or start with one of more than 50 predesigned plans and make changes like removing a wall or adding a window. Either way, the permit set is built to match.
Build timelines begin after the foundation is poured. In Washington, homes typically take 8 to 10 months, depending on weather, permitting, and the complexity of the design. That’s an estimate, not a guarantee.
Frequently Asked Questions
Do I need building permits in Kennewick to build a home?
Yes. New single family homes require a residential building permit from the City of Kennewick, or from Benton County if the lot is outside city limits.
How long does it take to get building permits in Kennewick?
It depends on the path. The city describes express review as finishing in under 48 hours for residential projects, with permits in two to three business days, while standard over the counter review is typically around 10 to 15 business days once the submittal is complete.
Is there an extra fee for faster review?
Yes. Express permitting adds a convenience fee of 20 percent of the permit fee for new single family homes.
Do building permits in Kennewick change if my lot is outside city limits?
They do. Lots inside city limits go through the City of Kennewick. Lots in unincorporated Benton County go through the county, and rural lots without city sewer need septic approval from the Benton Franklin Health District before submitting.
Can I build an accessory dwelling unit on my Kennewick property?
Kennewick’s zoning table allows accessory dwelling units in many zones, and they still need a building permit. Zoning and design rules vary by lot, so confirm yours with the Planning Department before drawing plans.
What if I’d rather not manage the permit process myself?
That’s where a full service builder helps. Adair Homes manages permitting along with site preparation and construction for homeowners building on their own land in Kennewick.